Skip to content

SB–01 · ARCHWAY, LONDON

Nine Floors Up. Nine Metres Down. Not a Beat Missed.

104 co-living units, a basement dig alongside nine rising floors. Complex site, clean delivery.

Co-Living Development — hero

Tight Site. Bold Solution. Zero Compromise.

A 9-storey, 104-unit co-living development built simultaneously upward and downward. Top-down construction tackling a 9-metre basement dig alongside nine rising floors, delivered on time without the complexity ever showing.

CO-LIVING DEVELOPMENT

§B — Before / during / after

Next — SB–02

Luxury Detached Home Refurbishment

Next project

§10 — Contact

Got a project in mind? Let's talk it through.

CallWhatsApp→Request a bid